Full Portfolio

Marlowe
Opus Station

This project highlights Miller Bros’ expertise in complex sitework and infrastructure development, encompassing demolition, ground improvement, water table management, and deep utility installations.

The scope includes the construction of a 275-unit multi-family development and a six-story parking ramp. Miller Bros provided over two years of pre-construction services, collaborating with the general contractor, geotechnical consultants, and specialty contractors to create a comprehensive and integrated work plan. This meticulous planning ensured the project stayed within budget and set the stage for seamless execution.

Miller Bros managed the demolition of a 55,000-square-foot precast structure, prioritizing sustainability by maximizing the recycling of concrete and steel. Site preparation involved correcting over 10,000 cubic yards of soil to improve the bearing capacity, a critical step for supporting the new development.

The team also upgraded city utility infrastructure to enable the construction of the multi-family building. To promote water conservation and sustainability, Miller Bros installed three underground stormwater storage tanks and five filtration structures, allowing for stormwater reuse.

This project demonstrates Miller Bros’ ability to integrate diverse services into a cohesive plan, streamlining coordination, mitigating risks, and delivering efficient, sustainable solutions.

Date

12 December 2024

Tags

Commercial


Versatile Sitework Solutions

Please fill the required field.

Get in Touch

M. M. Miller Brothers Excavating, Inc.

A20170 75th Avenue North 
Corcoran, Minnesota 55340

T763 420 9170

F763 420 9171